Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoDrainage

Showing 117 of 1025

Add a Brownfield Runoff tool under Preliminary Sizing > Calculators in the ribbon

To assist with initial site assessment, a brownfield runoff tool with printable reporting for the chosen rainfall events would be useful in the Preliminary sizing ribbon to allow analysis of brownfield and greenfield runoff rates from the same loc...
Guest 2 months ago in InfoDrainage / Hydrology 2 Already exists

Catchment area in different colour

currently the catchment area demarcation gives only a common colour at all area. we need to allow catchment area in different colors to demark Paved, unpaved, Road in details while we represent the details to client
Guest 2 months ago in InfoDrainage / Visualization 1 Gathering support

Assign A Unique Color for Each Catchment

it would be helpful if we could assign a unique color for each catchment instead of one color for all catchments with that I can assign for example brown for the catchments with the percentage impervious 100% and green for those with the percentag...
Guest 5 months ago in InfoDrainage / Visualization 1 Gathering support

Visualizer for "Multiple" Outlet Control Design

When designing a "multiple" outlet control for stormwater structures (such as a perforated riser), it would be helpful to have a visual schematic to ensure that the design intent is being captured. Multiple competitor tools (HydroCAD, Hydrology st...
Midori Patterson 3 months ago in InfoDrainage / Visualization 1 Gathering support

Variable depth for open channels and swales

One limitation we are running into is the inability to model varying depths within swales in InfoDrainage. Often open channels will run along road corridors for example where the crest either remains at a similar elevation while the depth changes....
Guest 11 months ago in InfoDrainage / Visualization 1 Under consideration

Insert contours at regular intervals instead of "double pegs"

Currently, contours can be added at irregular intervals by using the "double pegs" function in InfoDrainage. In reality, contours are always placed at regular intervals, such as a major contour at every 10 ft or 5 ft of elevation. The option to ad...
Daniel'le DeVoss about 1 month ago in InfoDrainage / Visualization 1 Gathering support

Swale with pipe under connected by manholes

Could not model real-life scenario where the pipe was under as conveyance for lesser events and raised via vented manholes into the swale above. Need integrated solution and was unable to model both and connect via manholes.
Guest 3 months ago in InfoDrainage / Hydraulics 1 Already exists

Cross and Longitudinal Slope for Surface SuDS features

Currently, when you try to model surface features, such as porous pavement, you can only adjust the longitudinal slope. However, when you try to model roads for example, you often have a separate cross fall, which I believe would be a useful addit...
Konstantinos Koutroulis 3 months ago in InfoDrainage / Other 1 Gathering support

Channel library similar to pipe library

It is essential to add / create library for rectangular channels with different width such as 300mm, 450mm width. Currently infodrainage choose a default 600mm wide rectangular channel. It is essential to have options to set minimum width other th...
Guest 5 months ago in InfoDrainage / Hydraulics 1 Gathering support

Allow different Phases to use the same background files

When creating a new network through phasing we often wish to use the same CAD levels and background used by another network, without having to load another version of the same CAD files.
Guest 7 months ago in InfoDrainage / Productivity 1 Will not implement