Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks WS Pro

Showing 79 of 1036

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest over 3 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011”...
Guest over 3 years ago in InfoWorks WS Pro / Other 0 Gathering support

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ...
Guest about 4 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

A simple way to straighten short links to display symbols more clearly

When using the "Expand Short Links" option I find that the expanded links will inherit some geometric points from the adjacent links, and hence symbols for valves, meters etc may not display too well if adjacent to a pipe bend. It would be useful ...
Owen Lewis about 4 years ago in InfoWorks WS Pro / Other 1 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest about 4 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Making a run in WS/WSpro now a (big) list of yellow warnings pop up. By using an optional selection of (run)validation items not anymore

Making a run in WS/WSpro the input always gets fully validated including items not used. Those items creates a (big) list (e.g. 81.273) of yellow warnings. Besides run/validation time causes this a list of not wanted necessary warnings which makes...
Guest over 2 years ago in InfoWorks WS Pro / Engine 0 Gathering support

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith almost 3 years ago in InfoWorks WS Pro / Engine 0 Gathering support

As a user it is good to allow tab windows to take it out to the second or third display

Tab windows are not allowed to move main window to second display.
Guest over 3 years ago in InfoWorks WS Pro 0 Will not implement

IWLive Pro to adopt simulation periods of ICMLive

Each simulation has a hindcast period, now and a forecast period
Guest over 4 years ago in InfoWorks WS Pro 0 Gathering support

I want more flexible shutdown runs

e.g.: I want to be able to evaluate shutdwon of pumping stations in 1 one run, now I have to create a seperate run for each pumping station. A workaround I use is closing links with a GRM config, but this only shuts down links for the whole simula...
Caroline Heylen over 2 years ago in InfoWorks WS Pro / Operations 1 Under consideration