Skip to Main Content
Autodesk
ADD A NEW IDEA

Productivity

Showing 15 of 1026

Ruby Script library & drag and drop

We are using more and more ruby scripts and currently you can only assign them to the custom buttons etc. It would be very useful to set them up in a similar way to layer liost groups, Stored Query groups, themes groups etc. so that you can import...
Duncan 9 days ago in InfoWorks WS Pro / Automation / Productivity 0 Gathering support

Improved Scenario Manager

Improved options around the parent child options. basically setting up a more structured option so that if you update a parent scenario (not just the base) then all child scenarios (ideally copied from during creation) would get the updates. i.e. ...
Duncan 4 months ago in InfoWorks WS Pro / Productivity 2 Under consideration

Creating Demand scaling from the Demand Area Window

In 2024.5 it is possible to choose to 'ignore leakage' and to 'scale demands' when using the demand area analysis tool. The scaling is happening on the demand (consumption) in the network. This means I have to create a new network (or scenario) ev...
Caroline Heylen 3 months ago in InfoWorks WS Pro / Productivity 0 Gathering support

Right click for graphs

I am a Bentley WaterGEMS user recently transitioning to InfoWorks WS Pro. While WaterGEMS has got its fair share of problems, the interface is very user friendly. For example: after you run the simulation, the graphs can be viewed just by a single...
Guest 6 months ago in InfoWorks WS Pro / Productivity 1 Gathering support

View time-varying profile count of impacted customers for criticality runs

Critical Link Analysis is powerful for understanding the summary impact of pipe closures/isolation, but sometimes the impacts are immediate and sometimes they're delayed several hours as reservoirs drain. The timing of customer outage impacts is u...
Nathan Gerdts 8 months ago in InfoWorks WS Pro / Productivity 0 Gathering support

Toggle to sync view between Long Section and GeoPlan

I want an option to synchronize the view between the Long section and the Geoplan. When turned on, the geoplan will automatically zoom to the current visible set of links in my long section. If I zoom in/out on either the map or long section, the ...
Nathan Gerdts 8 months ago in InfoWorks WS Pro / Productivity 0 Gathering support

I want combine Critical Link Analysis with multiple scenarios

Today I can only select 1 scenario when running a critical link analysis run (or maybe general multi runs). I want to be able tot select multiple. This way, if I have 5 scenarios, I do not have to create 5 separate runs to check criticality of all...
Caroline Heylen 6 months ago in InfoWorks WS Pro / Productivity 2 Gathering support

Parallel Computing for Optimising Simulation Times in Massive Network Models

Working with Infoworks WS Pro we have seen that the software never uses more than 2 logical processor without reaching more than 20% of CPU capacity. As a users we would like to take advantage of multi-threaded CPUs to accelerate simulation intens...
Juan Carlos Ortega 11 months ago in InfoWorks WS Pro / Cloud Simulations / Engine / Productivity 4 Gathering support

Enable re-runs for selected scenarios

With the new Reserved Run workflow I can re-run simulations with my latest changes quickly without needing to commit. However if I'm using scenarios in the run, WS Pro re-runs all scenarios every time, even if there weren't any changes. I want an ...
Nathan Gerdts 6 months ago in InfoWorks WS Pro / Productivity 0 Gathering support

Prevent tabs in Grid windows from always being hidden by scroll bar

The horizontal scroll bar at the bottom of the grid window occupies half the screen by default and needs to be constantly moved every time to access a common tab like pumps. Like EVERYTIME you close the window. It is actually a huge pain and shoul...
Casey Shannon 7 months ago in InfoWorks WS Pro / Productivity 1 Gathering support