Skip to Main Content
Autodesk
ADD A NEW IDEA

Water Quality

Showing 25 of 1040

Adding Level 2 water quality capabilities to the ICM UPM tool

The current UPM tool only allows for completion of level 1 water quality impact assessments. We believe that our assessments would benefit greatly by having the additional functionality to complete level 2 water quality impact assessments. This me...
Guest 10 months ago in InfoWorks ICM / Water Quality 0 Gathering support

Increasing speed of UPM water quality tool

As part of SOAF, we are required to run CSO water quality analyses using 10-year simulations. Using these outputs in the UPM tool often takes a long time. Whilst the tool is running, the modeller cannot use ICM for completing other tasks. We have ...
Guest 10 months ago in InfoWorks ICM / Water Quality 0 Gathering support

Adding Copy&Paste functionalities to the ICM UPM tool outputs

We would like to be able to easily copy paste the summarised results given by the UPM tool. We currently have to manually copy these results into excel which is prone to human error.
Guest 10 months ago in InfoWorks ICM / Water Quality 0 Gathering support

Updating the water quality UPM tool to be compliant with the 3rd edition of the UPM manual for Level 1 water quality analysis.

Updating the water quality UPM tool to be compliant with the 3rd edition of the UPM manual for Level 1 water quality analysis. This includes: Removing the dependency of exceedances in a river on spill duration. This would provide a more robust app...
Guest 10 months ago in InfoWorks ICM / Water Quality 0 Gathering support

Adding Level 3/4 water quality processing to the ICM upm tool.

For future catchment studies, we are looking at completing higher levels of water quality impact assessment, Level 3/Level 4. For this we would like the UPM tool to be able to integrate ICM river models to represent river flows and river quality a...
Guest 10 months ago in InfoWorks ICM / Water Quality 0 Gathering support

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest 10 months ago in InfoWorks ICM / Water Quality 0 Gathering support

Use tracers for water on mesh elements

Our clients are more and more trying to figure out if damage to a property is caused by water from the public area (which is the responsibility of the client) or from private areas (which is not). When rainfall on mesh can pick up a tracer (eg. fr...
Marcel Glasbergen about 2 years ago in InfoWorks ICM / 2D Flooding / Visualization / Water Quality 1 Gathering support

GPU for 2D Erosion Deposition Model

The 2D erosion-deposition model can only be simulated on the CPU. For 2D rain-on-mesh models with GPU simulation times spanning hours, it becomes impractical to integrate the 2D erosion-deposition model, as CPU simulation times would extend into d...
Daniel Fensom 6 months ago in InfoWorks ICM / Water Quality 0 Gathering support

Management of Siltation module within ICM Live

As part of our ICM Live system we use the Siltation module. While this creates a dynamic siltation on each pipe, there isn't an easy way to manage it. Once a pipe is cleaned we need to stop the live model and potentially apply all the dynamic silt...
Jose Pereira almost 3 years ago in InfoWorks ICM / Live Modeling / Water Quality 0 Gathering support

Using SWMM5 treatment equations at a node or link in ICM Networks

Users would like to use SWMM5 Buildup Washoff in ICM Networks AND the SWMM5 treatment equations at a node or link in the ICM St Venant solution. ICM SWMM networks have both options but for the purposes of using the powerful routing solution in I...
ROBERT DICKENSON almost 3 years ago in InfoWorks ICM / Treatment / Water Quality 2 Gathering support