Skip to Main Content
Autodesk
ADD A NEW IDEA

Results

Showing 45 of 1027

Results management - be able to see the size of sim results before they are downloaded from the cloud

It would offer additional, useful functionality if the user could see the size (MB/GB) of results files BEFORE downloading them locally. This could be shown via the log file, PRN, Results management, simulation properties, or all of the above. Any...
Saul Bradford about 2 months ago in InfoWorks ICM / Results 0 For Review

Document how results pfc vs r.pfc are calculated for open channels

in the long plots we ask for two capacities, we get pfc vs r.pfc for pipes they are the same , but for open channels such a trapezoidal they are different. there seems to be no literature on this.
John Krpan 19 days ago in InfoWorks ICM / Results 1 For Review

Statistical Analysis of ARR Temporal Pattern Ensembles should be enabled

Infoworks ICM should aim to facilitate statistical analysis of temporal pattern ensembles of ARR with a single click. Easily accessing and reviewing the statistical parameters for the required temporal pattern ensembles will allow Australian users...
Guest 28 days ago in InfoWorks ICM / Results 0 For Review

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest about 1 year ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Export run results to csv: timestep options

When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one ...
Guest about 1 year ago in InfoWorks ICM / Export Data / Results 0 Gathering support

Provide min_time_step on 2D results mesh

In an effort to speed simulations up - it would be helpful to know what mesh elements are slowing down a 2D simulation. A single Job Progress value is insufficient to chase down which of these 200K mesh elements is slowing down the model.
Matt Anderson 6 months ago in InfoWorks ICM / Results 1 Gathering support

Improve database and results files read performance

When opening an ICM network for the first time (i.e. no network files in the local files "Working" folder), the WDS reads through the database file in 4 kB chunks to retrieve the requested version of the network. This read process appears to be li...
Peter Dunlop over 2 years ago in InfoWorks ICM / Performance / Results 3 Gathering support

Include regulator state in graph reports

this can only be done with custom graphs, would be easier in standard graphs for run comparison
Guest about 1 year ago in InfoWorks ICM / Results 0 Gathering support

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh over 4 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body over 4 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support