Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks ICM

Showing 449 of 1027

Manually reorder (drag / drop) Model Group Headings

Rather than the model group being based on the view order, it would be good to have a view where you can move model groups to reorder them if preferred. An example is where you create a new model group heading, andwould like to move up in the orde...
Elliot Egan 5 months ago in InfoWorks ICM / Workgroup 1 Gathering support

Ability to use variables in range RTC rules

For RTC range rules, we want to be able to use variables instead of constant values for the minimum and maximum values.
Guest about 1 year ago in InfoWorks ICM / RTC 0 Gathering support

Create Ruby script syntax from ODIC/ODIC interface

The idea is to have a method available on InfoWorks ICM, InfoWorks WS Pro and InfoAsset Manager ODIC/ODEC interface that will create the equivalent Ruby syntax comprising all of the required parameters for the ODIC/ODEC methods. The Ruby script co...
Tony Andrews about 2 months ago in InfoWorks ICM / API / Exchange / Data Exchange 1 For Review

Adding Level 3/4 water quality processing to the ICM upm tool.

For future catchment studies, we are looking at completing higher levels of water quality impact assessment, Level 3/Level 4. For this we would like the UPM tool to be able to integrate ICM river models to represent river flows and river quality a...
Guest 10 months ago in InfoWorks ICM / Water Quality 0 Gathering support

Statistical Analysis of ARR Temporal Pattern Ensembles should be enabled

Infoworks ICM should aim to facilitate statistical analysis of temporal pattern ensembles of ARR with a single click. Easily accessing and reviewing the statistical parameters for the required temporal pattern ensembles will allow Australian users...
Guest 28 days ago in InfoWorks ICM / Results 0 For Review

Give a warning when copying between networks with different user defined defaults

when copying for example conduits between networks with flags #D for headloss and roughness, the values are adapted to the user defined values in the new network. This can be confusing.
Guest about 1 year ago in InfoWorks ICM / Flags / Import data / Productivity 0 Gathering support

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest about 1 year ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest 10 months ago in InfoWorks ICM / Water Quality 0 Gathering support

Improve ground infiltration simulation parameters.

Could we have a 'Node level affects groundwater infiltration' for the soil store please? This simulation parameter was introduced to InfoWorks ICM recently to limit infiltration from the ground store to the model. Could this be extended to limit f...
Tom Walker over 2 years ago in InfoWorks ICM / Calibration / Groundwater / Hydrology 0 Gathering support

Change the way scenarios work

When scenarios were first introduced the way they were implemented didn't seem intuitive. With increasing interest in such as adaptive pathways the number of scenarios can rapidly increase because each scenario is its own network. This proposal is...
andy.bolden 11 months ago in InfoWorks ICM / Scenario 0 Gathering support